Skip to content

Advancing BMD: Navigating Design Approaches and RAP Preheating Procedures

c16bc0cc-8f3d-4173-aa98-12cb9d77bc16

AUGUST 27, 2:00-3:30 PM EASTERN TIME

Register now!

This webinar is RCEP-eligible for live attendance.

This insightful webinar focuses on navigating the complexities of Balanced Mix Design (BMD) in asphalt pavement engineering. We delve into the latest guidance on progressing through BMD approaches, examining the pros and cons of different strategies outlined in AASHTO PP 105. Our discussion also spotlights the critical role of RAP (Reclaimed Asphalt Pavement) preheating procedures and their impact on BMD properties.

OUTCOMES

  • Gain insights into the different BMD approaches outlined in AASHTO PP 105 for implementing BMD performance tests. Learn how different strategies can influence the outcome of asphalt pavement designs and performance.
  • Explore the intricacies of RAP preheating procedures during asphalt mix design. Discover the implications of different preheating methods on RAP aging levels and overall mixture properties.
  • Dig into a comprehensive analysis of the effects of various RAP preheating procedures on asphalt mixture volumetric and mechanical properties. Gain actionable insights to optimize your asphalt mix designs and enhance pavement performance.

SPEAKERS

  • Randy West, PhD, PE, Director & Research Professor, NCAT
  • Chen Chen, PhD, Assistant Research Professor, NCAT

Past Posts

WVDOH December Material Indices

By JCrane | 2024/11/27

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of December 2024 as shown below.

Period – 12/1/2024
#2 Fuel (Gal) – $2.3226
Asphalt (Ton) – $574.00
Cement (Ton) – $195.28

Historical and individualized information can be found on our Index page.

WVDOH Specification Committee – December 4, 2024

By JCrane | 2024/11/27

The WVDOH announces its December Specifications Committee meeting, which is scheduled for Wednesday, December 4 at 9:00 a.m. at the WVDOH Building 5 Conference Room…

WVDOH Offering AWP Payroll and Subcontractor Payment Data Entry Training

By JCrane | 2024/11/22

For all WVDOH projects let after October 8th, 2024(Initial Announcement), industry is required to enter certified payroll and subcontractor payment data into the WVDOH’s project…

APA to Offer Asphalt Mix Design Courses

By JCrane | 2024/11/22

The Asphalt Pavement Association of West Virginia is offering an asphalt mix design course which will cover both Marshall and Superpave Mix Design methods.  These…

MP Committee Meeting – November 20, 2024

By JCrane | 2024/11/15

The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on November 20 at 10:00 a.m. at the Materials Control Soils and…

WVDOH Standards & Manuals Committee – Nov. 6

By JCrane | 2024/11/01

The WVDOH Standards & Manuals Committee’s next meeting will be held in person on November 6, 2024, at 9:00a.m. in Room 820 in Building 5…

WVDOH November Material Indices

By JCrane | 2024/10/31

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of November 2024 as shown below.

Period – 11/1/2024
#2 Fuel (Gal) – $2.3201
Asphalt (Ton) – $570.00
Cement (Ton) – $195.28

Historical and individualized information can be found at: https://www.asphaltwv.com/index/

WVDOH Offer AWP Training Schedule for Industry Sample Data Entry

By JCrane | 2024/10/17

UPDATED (2024-10-15) Virtual Meeting links added In accordance with revisions within the 2024 WVDOH Supplemental Specifications Section 106 – Control of Materials and MP 109.00.21…

WVDOH October Material Indices

By JCrane | 2024/10/01

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of October 2024 as shown below.

Period – 10/1/2024
#2 Fuel (Gal) – $2.2981
Asphalt (Ton) – $576.00
Cement (Ton) – $257.68

Historical and individualized information can be found at: https://www.asphaltwv.com/index/

APAWV Members Get I-79 South Reopens After Acid Spill

By JCrane | 2024/09/20

Interstate I-79 reopens southbound following emergency repairs on a 500-foot section near the Goshen Road exit.  Shortly after 1pm, Wednesday afternoon (9/18), a tractor-trailer overturned…