MP Committee Meeting – December 18, 2024
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on December 18 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV. For those unable to attend in person please join via Google Meet (see details below).
This month’s meeting agenda includes ten old business items as detailed below.
- 106.10.50 WVDOH Buy America Acceptance Guidelines
- Removes waiver for Manufactured Materials in anticipation of FHWA Update.
- 106.10.51 WVDOH Buy America Waiver Guideline(UP FOR VOTE)
- Clarifying updates, including flow chart for additional guidance
- 700.04.22 Method for Approving Devices Used for Testing Density and/or Moisture Content of In-Place Material(UP FOR VOTE)
- Process for creating approved list for Density/Moisture Devices
- 106.03.51 Policy for Materials Certification Reciprocity(UP FOR VOTE)
- Adds PCC technician reciprocity.
- 109.00.21 Basis For Charges for Non-Submittal of Sampling & Testing Documentation By The Established Deadline(UP FOR VOTE)
- References new document – MP 109.00.22 listed next.
- 109.00.22 Procedure for the Submission and Documentation of Quality Control Test Results(UP FOR VOTE)
- Defines the submission of QC samples by the contractor.
- 604.02.40 Inspection and Acceptance Procedures for Precast Concrete Products(UP FOR VOTE)
- Revised the cylinder fabrication frequency for dry cast concrete in Section 4.3.2
- 712.21.26 Procedure For Determining the Random Location of Compaction Tests(UP FOR VOTE)
- Previously approved MP with minor updates.
- 106.00.03 Guidelines For Establishing and Maintaining Approved Product Lists of Materials, Systems and Sources(UP FOR VOTE)
- Removal of NTPEP reference.
- 212.02.20 Procedure For Determining a Reduced Unit Price To Be Paid For Select Material For Backfilling Which Does Not Conform To Grading Requirements Of Governing Specifications(UP FOR VOTE)
- Removal of Table 1
Four new business items will also be presented to the committee:
- 718.00.00 Titus Sewer and Waterline Materials Procedure
- Define the specifications, standards, and requirements for materials used in sewer and waterline construction projects
- 715.14.01 Gum Quality Assurance of Laminated Elastomeric Bridge Bearing Pads with Internal Shims
- To set forth the procedures which govern the Quality Assurance testing of laminated (with internal shims) elastomeric bridge bearing pads.
- 401.02.29 Jack Guide For Quality Control and Acceptance Requirements For Superpave Asphalt Mixtures
- Removal of VFA Calculation
- ***The removal of VFA from QC happened through a previously issued memorandum, this will make that change permanent.
- 100.00.00 Boothroyd Preparing Materials Procedures
- Addition of Definition
The agenda also includes no MPs with editorial changes
For more details on the meeting packets, including redline copies of changes, click here. Members interested in submitting comments may do so to the CAWV MP Committee Chairman Evan Bailey at evan.bailey@wvpaving.com and/or John Crane at jcrane@asphaltwv.com. Please submit comments prior to the event.
TO JOIN VIA GOOGLE MEET:
http://meet.google.com/apa-rvti-ndx
To join by phone: 1 315-925-5747 --- PIN: 590164583
The Next MP committee will be held at MCS&T on February 19, 2025 at 10:00 AM.
Past Posts
WVDOH has informed APAWV that its November Specifications Committee meeting, which was scheduled for Wednesday, November 5, has been postponed until Wednesday, November 26. The…
West Virginia Department of Transportation released notice that updates to their BidX bidding process will take place beginning with the letting on December 9, 2025. …
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of November 2025 as shown below.
Period – 11/1/2024
#2 Fuel (Gal) – $2.4252
Asphalt (Ton) – $563.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
The West Virginia Division of Highways, WVDOH, has announced that all projects residing on the October 21st letting will be deferred to the October 28th…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of October 2025 as shown below.
Period – 10/1/2024
#2 Fuel (Gal) – $2.4995
Asphalt (Ton) – $579.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
The WVDOH announces its September Specifications Committee meeting, which is scheduled for Wednesday, September 24 at 9:00 a.m. at the WVDOH Building 5 Conference Room…
On Friday, September 5, 2025, WVDOH opened to bid their two annual asphalt purchase order contracts: Asphalt Material Pick Up by Agency; and Asphalt Materials,…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of September 2025 as shown below.
Period – 9/1/2024
#2 Fuel (Gal) – $2.4226
Asphalt (Ton) – $579.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
The WVDOH announced their upcoming Materials Procedures (MP) Committee meeting which will be held in person on August 25 at 10:00 a.m. at the Materials…
The WVDOH Standards & Manuals Committee’s next meeting will be held in person on August 13, 2025, at 9:00a.m. in Room 820 in Building 5…