MP Committee Meeting – December 18, 2024
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on December 18 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV. For those unable to attend in person please join via Google Meet (see details below).
This month’s meeting agenda includes ten old business items as detailed below.
- 106.10.50 WVDOH Buy America Acceptance Guidelines
- Removes waiver for Manufactured Materials in anticipation of FHWA Update.
- 106.10.51 WVDOH Buy America Waiver Guideline(UP FOR VOTE)
- Clarifying updates, including flow chart for additional guidance
- 700.04.22 Method for Approving Devices Used for Testing Density and/or Moisture Content of In-Place Material(UP FOR VOTE)
- Process for creating approved list for Density/Moisture Devices
- 106.03.51 Policy for Materials Certification Reciprocity(UP FOR VOTE)
- Adds PCC technician reciprocity.
- 109.00.21 Basis For Charges for Non-Submittal of Sampling & Testing Documentation By The Established Deadline(UP FOR VOTE)
- References new document – MP 109.00.22 listed next.
- 109.00.22 Procedure for the Submission and Documentation of Quality Control Test Results(UP FOR VOTE)
- Defines the submission of QC samples by the contractor.
- 604.02.40 Inspection and Acceptance Procedures for Precast Concrete Products(UP FOR VOTE)
- Revised the cylinder fabrication frequency for dry cast concrete in Section 4.3.2
- 712.21.26 Procedure For Determining the Random Location of Compaction Tests(UP FOR VOTE)
- Previously approved MP with minor updates.
- 106.00.03 Guidelines For Establishing and Maintaining Approved Product Lists of Materials, Systems and Sources(UP FOR VOTE)
- Removal of NTPEP reference.
- 212.02.20 Procedure For Determining a Reduced Unit Price To Be Paid For Select Material For Backfilling Which Does Not Conform To Grading Requirements Of Governing Specifications(UP FOR VOTE)
- Removal of Table 1
Four new business items will also be presented to the committee:
- 718.00.00 Titus Sewer and Waterline Materials Procedure
- Define the specifications, standards, and requirements for materials used in sewer and waterline construction projects
- 715.14.01 Gum Quality Assurance of Laminated Elastomeric Bridge Bearing Pads with Internal Shims
- To set forth the procedures which govern the Quality Assurance testing of laminated (with internal shims) elastomeric bridge bearing pads.
- 401.02.29 Jack Guide For Quality Control and Acceptance Requirements For Superpave Asphalt Mixtures
- Removal of VFA Calculation
- ***The removal of VFA from QC happened through a previously issued memorandum, this will make that change permanent.
- 100.00.00 Boothroyd Preparing Materials Procedures
- Addition of Definition
The agenda also includes no MPs with editorial changes
For more details on the meeting packets, including redline copies of changes, click here. Members interested in submitting comments may do so to the CAWV MP Committee Chairman Evan Bailey at evan.bailey@wvpaving.com and/or John Crane at jcrane@asphaltwv.com. Please submit comments prior to the event.
TO JOIN VIA GOOGLE MEET:
http://meet.google.com/apa-rvti-ndx
To join by phone: 1 315-925-5747 --- PIN: 590164583
The Next MP committee will be held at MCS&T on February 19, 2025 at 10:00 AM.
Past Posts
– WVDOH August Materials Procedures Committee Meeting WVDOH announced their August Materials Procedures Committee with details listed below. A copy of the agenda and proposed…
– WVDOH August Standards and Manuals Committee Meeting WVDOH announced their August Standards and Manuals Committee with details listed below. A copy of the agenda…
– WVDOH July Specifications Committee Meeting WVDOH announced their July Specifications Committee with details listed below. A copy of the agenda and proposed changes are…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of July 2026 as shown below.
Period – 7/1/2026
#2 Fuel (Gal) – $3.2970
Asphalt (Ton) – $695.00
Cement (Ton) – $202.45
Historical and individualized information can be found on our Index page.
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of June 2026 as shown below.
Period – 6/1/2026
#2 Fuel (Gal) – $4.4160
Asphalt (Ton) – $689.00
Cement (Ton) – $185.00
Historical and individualized information can be found on our Index page.
– WVDOH announced their May Specifications Committee meeting for Tuesday, May 5 at 10:00 a.m. at WVDOH’s MCS&T Office at 190 Dry Branch Drive, Charleston WV…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of May 2026 as shown below.
Period – 5/1/2026
#2 Fuel (Gal) – $3.9767
Asphalt (Ton) – $675.00
Cement (Ton) – $290.29
Historical and individualized information can be found on our Index page.
– WVDOH announced their upcoming Standards and Manuals Committee meeting which will be held in person on Tuesday, April 7 at 10:00 a.m. in the…
– WVDOH has announced their upcoming Material Procedure (MP) Committee meeting which will be held in person on Tuesday, April 21 at 10:00 a.m. at…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of April 2026 as shown below.
Period – 4/1/2026
#2 Fuel (Gal) – $4.1051
Asphalt (Ton) – $618
Cement (Ton) – $295.35
Historical and individualized information can be found on our Index page.