MP Committee Meeting – April 16, 2025
The WVDOH announced an upcoming Materials Procedures (MP) Committee meeting. The meeting will be held in person on April 16 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV. For those unable to attend in person please join via Google Meet (see details below).
This month’s meeting agenda includes ten old business items as detailed below.
- 106.10.50 WVDOH Buy America Acceptance Guidelines(UP FOR VOTE)
- Removes waiver for Manufactured Materials in anticipation of FHWA Update.
- 700.04.22 Method for Approving Devices Used for Testing Density and/or Moisture Content of In-Place Material(UP FOR VOTE)
- Process for creating approved list for Density/Moisture Devices
- 307.00.50 - Guide for Quality Control and Acceptance Plans for Subgrade, Base Course, and Aggregate Items
- Addition of Trail Surface Aggregate
- 679.02.99 - Calibration of Concrete Continuous Mobile Mixer
- New Document. Kiana to discuss.
- MA-1 - Operating and Emergency Procedures for Nuclear Gauges
- Reconfirmation/update of practices
- ML-25 - Procedure for Monitoring the Activities Related to Sieve Analysis of Fine and Coarse Aggregate
- Reconfirmation/update of practices
- 711.03.23 - Mix Design for Portland Cement Concrete
- Replacing the Rapid Chloride Permeability test with the Surface Resistivity Test, and the SAM testing requirements for Mix Design approval.
- 601.00.49 - Method of Test for Determining the Condition of Concrete Bridge Decks
- New Document. Kiana to discuss.
- 700.00.54 - Procedure for Evaluating Quality Control Sample Test Results with Verification Sample Test Results
- Significant Updates, Dan to discuss.
- 106.03.50 - General Information Guide for Technician and Inspector Certification Program (TICP)
- Changing 3 to 5 years for certification, adds apprentice program.
A single new business items will also be presented to the committee:
- 700.00.50 Method for Acceptance of Compaction Testing
- Addition of Definition
The agenda also includes no MPs with editorial changes
For more details on the meeting packets, including redline copies of changes, click here. Members interested in submitting comments may do so to the CAWV MP Committee Chairman Evan Bailey at evan.bailey@wvpaving.com and/or John Crane at jcrane@asphaltwv.com. Please submit comments prior to the event.
TO JOIN VIA GOOGLE MEET:
https://meet.google.com/qaq-awvh-wcv
To join by phone: 929-329-2405 --- PIN: 516138058
The Next MP committee will be held at MCS&T on June 18, 2025 at 10:00 AM.
Past Posts
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of December 2025 as shown below.
Period – 12/1/2024
#2 Fuel (Gal) – $2.6849
Asphalt (Ton) – $549.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
UPDATE – (2025-11-24) WVDOH has informed APAWV that its November 26th Specification Committee meeting has been postponed until Thursday, December 4th. As they become available,…
UPDATE(2025-11-14) West Virginia Department of Transportation announced a delay to their transition to the new enhanced browser-based bidding workflows in BidX.com. Originally slated for December…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of November 2025 as shown below.
Period – 11/1/2024
#2 Fuel (Gal) – $2.4252
Asphalt (Ton) – $563.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
The West Virginia Division of Highways, WVDOH, has announced that all projects residing on the October 21st letting will be deferred to the October 28th…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of October 2025 as shown below.
Period – 10/1/2024
#2 Fuel (Gal) – $2.4995
Asphalt (Ton) – $579.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
The WVDOH announces its September Specifications Committee meeting, which is scheduled for Wednesday, September 24 at 9:00 a.m. at the WVDOH Building 5 Conference Room…
On Friday, September 5, 2025, WVDOH opened to bid their two annual asphalt purchase order contracts: Asphalt Material Pick Up by Agency; and Asphalt Materials,…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of September 2025 as shown below.
Period – 9/1/2024
#2 Fuel (Gal) – $2.4226
Asphalt (Ton) – $579.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
The WVDOH announced their upcoming Materials Procedures (MP) Committee meeting which will be held in person on August 25 at 10:00 a.m. at the Materials…