MP Committee Meeting – June 25, 2025
The WVDOH announced their upcoming Materials Procedures (MP) Committee meeting which will be held in person on June 25 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV. For those unable to attend in person please join via Google Meet (see details below).
This month’s meeting agenda includes SIX old business items as detailed below.
- 700.04.22 Method for Approving Devices Used for Testing Density and/or Moisture Content of In-Place Material(UP FOR VOTE)
- Process for creating approved list for Density/Moisture Devices
- 679.02.99 - Calibration of Concrete Continuous Mobile Mixer
- This is a guideline for QC to verify the contractor's calibration of volumetric mixers. Kiana to discuss.
- 106.03.50 - General Information Guide for Technician and Inspector Certification Program (TICP)
- Changing 3 to 5 years for certification, adds apprentice program.
- 700.00.50 - Method for Acceptance of Compaction Testing(UP FOR VOTE)
- New Acceptance Process through AWP.
- 700.00.54 - Procedure for Evaluating Quality Control Sample Test Results with Verification Sample Test Results(UP FOR VOTE)
- Significant Updates, Dan to discuss.
- 601.00.49 - Method of Test for Determining the Condition of Concrete Bridge Decks(UP FOR VOTE)
- Andrew to Discuss Changes from Previously Approved Version
Six new business items will also be presented to the committee:
- 601.05.50 Quality Assurance Procedures for Portland Cement Concrete
- Changed the referenced Section in 2.4.5 to 5.2.9 from 4.2.9.
- 604.02.40 Inspection And Acceptance Procedures for Precast Concrete Products
- 6x12 cylinders from the Specification
- 711.03.23 Mix Design for Portland Cement Concrete
- Andrew to Discuss
- 715.14.01 Quality Assurance of Laminated Elastomeric Bridge Bearing Pads with Internal Shims
- Editorial Edits from previously approved version
- 109.00.23 Auto-Authorization of Industry Sample Records
- Addition of a "fast pass" metric for industry sample record payment.
- 109.00.22 Procedure for the Submission and Documentation of Quality Control Test Results
- Adds reference to 109.00.23
The agenda also includes two MPs with editorial changes
- 700.04.22 Operating And Emergency Procedures for Nuclear Gauges
- Renamed from MA-1
- 307.0051 Procedure for Monitoring the Activities Related to Sieve Analysis of Fine and Coarse Aggregate
- Renamed from ML-25
For more details on the meeting packets, including redline copies of changes, click here. Members interested in submitting comments may do so to the CAWV MP Committee Chairman Evan Bailey at evan.bailey@wvpaving.com and/or John Crane at jcrane@asphaltwv.com. Please submit comments prior to the event.
TO JOIN VIA GOOGLE MEET:
https://meet.google.com/qaq-awvh-wcv
To join by phone: 929-329-2405 --- PIN: 516138058
The Next MP committee will be held at MCS&T on August 20, 2025 at 10:00 AM.
Past Posts
UPDATED (2024-10-15) Virtual Meeting links added In accordance with revisions within the 2024 WVDOH Supplemental Specifications Section 106 – Control of Materials and MP 109.00.21…
Olivia fell into the asphalt industry while still in college, and got a summer internship working in a quality control lab. She says, “I loved this job so much I immediately joined the Shelly Company full time after I graduated in 2019. During my time there I worked in construction scheduling and mainly estimating. I was fortunate to work with many crews and be exposed to many parts of the company that gave me appreciation for the industry as a whole.”
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of October 2024 as shown below.
Period – 10/1/2024
#2 Fuel (Gal) – $2.2981
Asphalt (Ton) – $576.00
Cement (Ton) – $257.68
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
Interstate I-79 reopens southbound following emergency repairs on a 500-foot section near the Goshen Road exit. Shortly after 1pm, Wednesday afternoon (9/18), a tractor-trailer overturned…
The WVDOH announces its October Specifications Committee meeting, which is scheduled for Wednesday, October 2 at 9:00 a.m. at the WVDOH Building 5 Conference Room…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on September 18 at 10:00 a.m. at the Materials Control Soils and…
Register Here APAWV members be sure to register for the 42nd Annual Fall Meeting being held October 10-13, 2024. Please note that the room rates…
Jodi started at Kelly Paving, Inc in 2002 as a Flagger through the WV Laborers Apprentice Program. In 2019, She was promoted to a Foreman position as Traffic Control Supervisor. In 2023, she became a Milling Foreman. She said the main reason she got into Construction was her entire family worked in the industry. Jodi brings an enthusiastic and positive attitude to work every day. She does an excellent job uniting everyone from hired haul drivers to subcontractors to achieve the common goal and is an instrumental part in making things happen out on the road. Jodi says, “I tell everyone the only thing I would have done differently was I would have started this career sooner. I love my job!” She does an excellent job uniting everyone from hired haul drivers to subcontractors to achieve the common goal. You will never find her without a smile on her face.
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of September 2024 as shown below.
Period – 9/1/2024
#2 Fuel (Gal) – $2.3525
Asphalt (Ton) – $588.00
Cement (Ton) – $210.23
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
The WVDOH released their annual Purchase Order Contracts for asphalt materials. Both contracts will accept bids until September 19th. See details for both Purchase Order…