The WVDOH announces its July Specifications Committee meeting, which is scheduled for Wednesday, July 9 at 9:00 a.m. at the WVDOH Building 5 Conference Room 820(Technical Support) at 1900 Kanawha Blvd. E., Charleston WV. For those unable to attend in person please join via Google Meet, details below.
A copy of the agenda and proposals can be found at: 20250709_JulySpecificationsCommitteeAgenda.
Critical things to look for in the meeting packet (this is not all encompassing please review the entire packet):
- Section 651-Furnishing and Placing Soil, Section 652-Seeding and Mulching & Section 715.25-715.32
- Section Rewrite updating the requirements for seeding and mulching.
- 642.6-Silt Fence & 642.7-Method of Measurement (Table 642.7.1)
- Section Rewrite
- SP601-Mass Concrete & Supporting Specifications
- Section rewrite based on WVU research. Currently being held in committee which revisions by WVDOH are being made.
- WV Jobs Act SP
- Revision updates violation language from 2018, raising penalties to prime contractor and subcontractors failing to meet requirements of West Virginia Jobs Act.
- ($100/day of violation is being revised to $250/employee outside requirements/day)
- 109.20.1-Electronic Ticket Delivery
- Adds steel superstructure components (pre-fab or construct on site) and stay-in-place forms.
- 401.13.3 and 403-Joint and Crack Sealing of Asphalt Pavements
- The revision adds requirement for sealing all longitudinal joints regardless of achieved density
- 420.2.2-Fine Aggregate,2FA and 3FA
- The revision shifts Type 2FA requirements for Sieves No. 8 and No. 30 to ensure there are no conflicts with the existing aggregate being used within West Virginia.
- 601.3.2.1-Concrete Consistency
- The revision clarifies that a superplasticizer may be used in field adjustments regardless if it was included in the original approved mix design.
- Special Provisions 601 - Ultra High Performance Concrete
- The revision updates a previously approved SP by adding SMARTUP, and replacing “Holcim” with “AMERIZE”.
- 601.3-Proportioning Special Provision for Surface Resistivity of Lightweight Concrete.
- The revision updates a previously approved SP by adding sections that detail Surface Resistivity Testing.
Comments are requested on these Specification changes and Project Specific Special Provisions and may be submitted directly to Jacinda Chapman, Publication Assistant at the WVDOH at jacinda.n.chapman@wv.gov or to the CAWV Specifications Committee Chairman, Chad Miller, at cmiller@jfallenco.com, and John Crane at jcrane@asphaltwv.com. Please share comments in advance of the meeting to ensure they can be reviewed/discussed at the meeting.
TO JOIN VIA GOOGLE MEET
To join by phone dial +1 475-549-0367 | PIN: 452751241
Past Posts
Registration for the 45th Asphalt Paving Conference and Award Luncheon is open, click here to register! The Conference and Luncheon will be held on February…
Dana’s journey in the asphalt industry has been shaped by both family influence and her evolving career interests. Growing up with her father, Don, who is a sales representative for Mulzer Crushed Stone, Dana was always surrounded by the world of construction and paving. However, when she started her studies at Marshall University, she wasn’t certain about her career path. It wasn’t until her senior year that she discovered her passion for Human Resources and decided to pursue it further.
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on December 18 at 10:00 a.m. at the Materials Control Soils and…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of December 2024 as shown below.
Period – 12/1/2024
#2 Fuel (Gal) – $2.3226
Asphalt (Ton) – $574.00
Cement (Ton) – $195.28
Historical and individualized information can be found on our Index page.
The WVDOH announces its December Specifications Committee meeting, which is scheduled for Wednesday, December 4 at 9:00 a.m. at the WVDOH Building 5 Conference Room…
For all WVDOH projects let after October 8th, 2024(Initial Announcement), industry is required to enter certified payroll and subcontractor payment data into the WVDOH’s project…
UPDATE – Both class offerings are currently full, however if the certification is still needed please contact the APAWV jcrane@asphaltwv.com UPDATE – The March class…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on November 20 at 10:00 a.m. at the Materials Control Soils and…
The WVDOH Standards & Manuals Committee’s next meeting will be held in person on November 6, 2024, at 9:00a.m. in Room 820 in Building 5…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of November 2024 as shown below.
Period – 11/1/2024
#2 Fuel (Gal) – $2.3201
Asphalt (Ton) – $570.00
Cement (Ton) – $195.28