WVDOH Standards/Manuals Committee – August 4, 2026
Posted By: JCrane - 2026/07/24
| WVDOH August Standards and Manuals Committee Meeting | |||
| WVDOH announced their August Standards and Manuals Committee with details listed below. A copy of the agenda and proposed changes are attached and will be posted online at the Standards and Manuals Committee webpage HERE. Please Contact jcrane@asphaltwv.com with questions or comments, comments are due Friday prior to the meeting. |
|||
| Meeting Details | Discipline Links | Items Included | |
| Date: | Tuesday, August 4, 2026 | Asphalt / Pavement | DD-647 / DD-648 / LCCA Report |
| Time: | 10:00 a.m. - 11:00 a.m. | Concrete / Cement / Reinforcing | — |
| Location: | Materials Control, Soils & Testing Division | Contract Administration / Bidding / Federal Requirements | DD-105 / DD-101 / Construction Manual Section 110 |
| Address: | 190 Dry Branch Drive, Charleston, WV | Stone / Earthwork / Erosion Control / Seeding | — |
| Meeting Link: | meet.google.com/kzu-rfth-ndi | Traffic / Work Zone / Lighting / Electrical / Coatings & Paint | — |
| Call-in #: | 812-727-7675 | Structures / Bridges / Steel | — |
| PIN: | 145689040 | Previously Approved Items | DD-644 / DD-646 / Drainage Manual Chapter 6 |
| Asphalt / Pavement Items | ||
| Item / Topic | Status | Summary of Change |
| DD-647 Life-Cycle Cost Analysis for Pavement Design |
Old Business | Major revision and restructuring of the pavement LCCA procedure. The draft updates references and links; uses a 50-year analysis period; separates initial agency cost, user cost, future activity cost, and discount-rate inputs; applies a five-year average of the OMB Circular A-94 30-year real interest rate; and defines NPV as Initial Cost + Future Activity Cost + User Cost. Repetitive language is removed, and the former “C” factor is redefined as the Life-Cycle Cost Factor (future activity cost plus user cost) for consistency with Special Provision 103. The annually prepared WVDOH LCCA Report and resulting factors will be reviewed by the Committee and published with the Design Directives. |
| DD-648 Alternate Design and Alternate Bidding of Pavements |
Old Business | Major revision and restructuring of the Alternate Design/Alternate Bid process to align with DD-647 and the approved LCCA Report. The draft clarifies use of the A + B + C method, with award generally based on A + C; requires asphalt and jointed plain concrete alternatives to be bid as complete pavement systems under Special Provision 695; and calculates NPV as Initial Cost + (Total Lane Miles x Life-Cycle Cost Factor). Alternatives more than 20% apart in total NPV are narrowed to the lower-cost pavement, while factors within 1% may be omitted from the bid comparison. The adjusted contract bid is determined under Special Provision 103. |
| LCCA Report 2025 Life Cycle Cost Analysis |
Old Business | Establishes non-project-specific Life-Cycle Cost Factors using WVDOH historical costs and FHWA RealCost 3.0 over a 50-year analysis period with a 1.4% discount rate. Inputs include $321,000 per lane-mile for concrete pavement repair; $87,000 for asphalt preservation; $228,000 for a 2-inch mill and fill; $398,000 for a 4-inch mill and fill; routine asphalt maintenance of $15,000 per lane-mile every four years; and routine concrete maintenance of $30,000 per lane-mile every eight years. Recommended factors are $608,000 per lane-mile for asphalt with preservation, $515,000 for concrete with CPR, and $716,000 for asphalt with mill and fill. The report will be incorporated by reference into DD-647 and DD-648, reviewed annually, and published on the WVDOH Publications webpage. |
| Back to Top | ||
| Concrete / Cement / Reinforcing Items | ||
| Item / Topic | Status | Summary of Change |
| — | — | No items listed in the agenda packet. |
| Back to Top | ||
| Contract Administration / Bidding / Federal Requirements Items | ||
| Item / Topic | Status | Summary of Change |
| DD-105 Publication Development and Approval Process |
Old Business Up for Vote |
Complete rewrite of the procedures for developing, reviewing, approving, and publishing WVDOH Specifications/Special Provisions, Standards, Manuals, and Material Procedures. The draft establishes MCS&T administrative authority; defines Champion responsibilities; creates a five-division voting structure with a three-member quorum and majority approval; requires Open Government Meeting Act compliance; generally requires two committee meetings before a vote; allows one-meeting approval for minor/editorial changes; and establishes an emergency or exceptional project-specific approval path. The agenda states the latest revision requires FHWA concurrence for all committee-approved items. Approval is expected at the August meeting. |
| Construction Manual Section 110 Change Orders |
Old Business Up for Vote |
Major revision throughout Section 110 to clarify the Change Order review and approval chain and improve coordination among project staff, District/Regional personnel, Contract Administration, FHWA, the Contractor, and the Surety. Section 110.2.3 and the processing flowcharts are revised to reflect AASHTOWare approval roles; identify FHWA review for non-delegated Federal projects or Projects of Division Interest; and elevate monetary changes of $200,000 or more or time extensions of 30 days or more through the Director of Contract Administration and Deputy State Highway Engineer - Construction. Related language for Federal-aid concurrence, major changes/extra work, processing sequence, documentation, and LME Force Account work is updated. Approval is expected at the August meeting. |
| DD-101 Correspondence |
New Business | Revises the correspondence directive that supersedes the June 18, 2014 version. The draft removes outdated named officials, mailing addresses, and references to the former Technical Support Division; directs correspondence to the manager of the responsible Division; retains standardized subject references for project numbers, route/bridge numbers, project description, subject, and county; and replaces static contact listings with links to current WVDOH Division and District webpages. |
| Back to Top | ||
| Stone / Earthwork / Erosion Control / Seeding Items | ||
| Item / Topic | Status | Summary of Change |
| — | — | No items listed in the agenda packet. |
| Back to Top | ||
| Traffic / Work Zone / Lighting / Electrical / Coatings & Paint Items | ||
| Item / Topic | Status | Summary of Change |
| — | — | No items listed in the agenda packet. |
| Back to Top | ||
| Structures / Bridges / Steel Items | ||
| Item / Topic | Status | Summary of Change |
| — | — | No items listed in the agenda packet. |
| Back to Top | ||
| Previously Approved Items | ||
| Item / Topic | Status | Summary of Change |
| DD-644 Asphalt Pavement |
Previously Approved | Approved at the June 2, 2026 Standards Committee meeting. The packet lists the item as an approved standard change and provides no additional revision details. |
| DD-646 Pavement Design Guide |
Previously Approved | Approved at the June 2, 2026 Standards Committee meeting. The packet lists the item as an approved standard change and provides no additional revision details. |
| Drainage Manual Chapter 6 Ditches |
Previously Approved | Approved at the June 2, 2026 Manuals Committee meeting. The packet lists the item as an approved manual change and provides no additional revision details. |
| Back to Top | ||
Past Posts
– The West Virginia Division of Highways, WVDOH, has announced that all projects residing on the October 21st letting will be deferred to the October…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of October 2025 as shown below.
Period – 10/1/2024
#2 Fuel (Gal) – $2.4995
Asphalt (Ton) – $579.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
The WVDOH announces its September Specifications Committee meeting, which is scheduled for Wednesday, September 24 at 9:00 a.m. at the WVDOH Building 5 Conference Room…
– On Friday, September 5, 2025, WVDOH opened to bid their two annual asphalt purchase order contracts: Asphalt Material Pick Up by Agency; and Asphalt…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of September 2025 as shown below.
Period – 9/1/2024
#2 Fuel (Gal) – $2.4226
Asphalt (Ton) – $579.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
The WVDOH announced their upcoming Materials Procedures (MP) Committee meeting which will be held in person on August 25 at 10:00 a.m. at the Materials…
The WVDOH Standards & Manuals Committee’s next meeting will be held in person on August 13, 2025, at 9:00a.m. in Room 820 in Building 5…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of August 2025 as shown below.
Period – 8/1/2024
#2 Fuel (Gal) – $2.5232
Asphalt (Ton) – $579.00
Cement (Ton) – $282.40
Historical and individualized information can be found on our Index page.
On July 12, the CAWV Highway/Heavy Division met in conjunction with the CAWV Annual meeting at The Greenbrier. Division Chairman Ryan Cocco called the Division…
June 30th marked the closure of West Virginias 2025 fiscal year, bringing the 2025 State Road Fund to and end as well. WV again finished…