Skip to content

WVDOH Specification Committee – December 1, 2026

Posted By: JCrane - 2026/11/25
2023 standard cover


WVDOH December Special Specifications Committee Meeting
WVDOH announced their December Special Specifications Committee meeting with details listed below. A copy of the agenda and proposed changes are attached and will be posted online at the Specifications Committee at HERE. Please contact jcrane@asphaltwv.com with questions or comments; comments are due Friday prior to the meeting.
Meeting Details Discipline Links Items Included
Date: Tuesday, December 1, 2026 Asphalt / Pavement SP720
Time: 8:30–9:00 a.m. Eastern Concrete / Cement / Reinforcing  
Location: MCS&T Library Contract Administration / Bidding / Federal Requirements 107
Address: 190 Dry Branch Drive, Charleston, WV Stone / Earthwork / Erosion Control / Seeding  
Meeting Link: meet.google.com/pkr-qgtn-gxi Traffic / Work Zone / Lighting / Electrical / Coatings & Paint  
Call-in #: +1 413-400-3177 Structures / Bridges / Steel  
PIN: 486 661 965# Previously Approved Items  
Asphalt / Pavement Items
Item / Topic Status Summary of Change
SP720
Smoothness Testing
New Business
Up for Vote
Complete replacement of Section 720 through a Special Provision. Adds performance-based smoothness evaluation for qualifying Interstate bridge decks and approaches under 720.7, with 25-foot MRI lots and separate price-adjustment tables for bridges with and without armored expansion joints. Qualifying encounters require approach work and at least 150 feet of new pavement beyond each approach; asphalt must have a 2-inch surface course. MRI of 600.1 in./mi. or greater requires corrective action. The draft also revises roadway profiler certification, QC/QA testing and comparisons, and NHS/non-NHS pavement adjustments. No comments or changes were received since the last meeting.
Back to Top
Concrete / Cement / Reinforcing Items
Item / Topic Status Summary of Change
No items on this agenda.
Back to Top
Contract Administration / Bidding / Federal Requirements Items
Item / Topic Status Summary of Change
107
107.5.1 - Covered Unmanned Aircraft Systems (UAS)
New Business
Up for Vote
Adds FHWA-recommended federal-aid contract language at 107.5.1. Contractors may not procure or operate a covered UAS manufactured or assembled by a covered foreign entity in performing the contract. They must provide manufacturer and supply-chain provenance upon request; material misrepresentation of origin is grounds for contract termination and other remedies. The draft has a minor editorial update since the last meeting.
Back to Top
Stone / Earthwork / Erosion Control / Seeding Items
Item / Topic Status Summary of Change
No items on this agenda.
Back to Top
Traffic / Work Zone / Lighting / Electrical / Coatings & Paint Items
Item / Topic Status Summary of Change
No items on this agenda.
Back to Top
Structures / Bridges / Steel Items
Item / Topic Status Summary of Change
No items on this agenda.
Back to Top
Previously Approved Items
Item / Topic Status Summary of Change
No items on this agenda.
Back to Top

Past Posts

WVDOH Material Procedure Committee – October 6, 2026

By JCrane | 2026/09/30

– WVDOH October Materials Procedures Committee Meeting WVDOH announced their October Materials Procedures Committee meeting with details listed below. A copy of the agenda and…

WVDOH Advertise FY 2027 Asphalt PO Contracts

By JCrane | 2026/09/05

– UPDATE: (2026-09-18) On September 16th, WVDOH released two amendments for their Asphalt Laydown Purchase Order to address the various questions which were received during…

WVDOH September 2026 Material Indices

By JCrane | 2026/09/01

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of September 2026 as shown below.

Period – 9/1/2026
#2 Fuel (Gal) – $4.4728
Asphalt (Ton) – $694.00
Cement (Ton) – $204.45

Historical and individualized information can be found on our Index page.

WVDOH August 2026 Material Indices

By JCrane | 2026/08/01

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of August 2026 as shown below.

Period – 8/1/2026
#2 Fuel (Gal) – $3.2970
Asphalt (Ton) – $695.00
Cement (Ton) – $202.45

Historical and individualized information can be found on our Index page.

WVDOH Material Procedure Committee – August 4, 2026

By JCrane | 2026/07/24

– WVDOH August Materials Procedures Committee Meeting WVDOH announced their August Materials Procedures Committee with details listed below. A copy of the agenda and proposed…

WVDOH Standards/Manuals Committee – August 4, 2026

By JCrane | 2026/07/24

– WVDOH August Standards and Manuals Committee Meeting WVDOH announced their August Standards and Manuals Committee with details listed below. A copy of the agenda…

WVDOH Specification Committee – July 7, 2026

By JCrane | 2026/06/25

– WVDOH July Specifications Committee Meeting WVDOH announced their July Specifications Committee with details listed below. A copy of the agenda and proposed changes are…

WVDOH July 2026 Material Indices

By JCrane | 2026/06/25

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of July 2026 as shown below.

Period – 7/1/2026
#2 Fuel (Gal) – $3.2970
Asphalt (Ton) – $695.00
Cement (Ton) – $202.45

Historical and individualized information can be found on our Index page.

WVDOH June 2026 Material Indices

By JCrane | 2026/06/01

WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of June 2026 as shown below.

Period – 6/1/2026
#2 Fuel (Gal) – $4.4160
Asphalt (Ton) – $689.00
Cement (Ton) – $185.00

Historical and individualized information can be found on our Index page.

WVDOH Specification Committee – May 5, 2026

By JCrane | 2026/04/30

– WVDOH announced their May Specifications Committee meeting for Tuesday, May 5 at 10:00 a.m. at WVDOH’s MCS&T Office at 190 Dry Branch Drive, Charleston WV…