MP Committee Meeting – June 25, 2025
The WVDOH announced their upcoming Materials Procedures (MP) Committee meeting which will be held in person on June 25 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV. For those unable to attend in person please join via Google Meet (see details below).
This month’s meeting agenda includes SIX old business items as detailed below.
- 700.04.22 Method for Approving Devices Used for Testing Density and/or Moisture Content of In-Place Material(UP FOR VOTE)
- Process for creating approved list for Density/Moisture Devices
- 679.02.99 - Calibration of Concrete Continuous Mobile Mixer
- This is a guideline for QC to verify the contractor's calibration of volumetric mixers. Kiana to discuss.
- 106.03.50 - General Information Guide for Technician and Inspector Certification Program (TICP)
- Changing 3 to 5 years for certification, adds apprentice program.
- 700.00.50 - Method for Acceptance of Compaction Testing(UP FOR VOTE)
- New Acceptance Process through AWP.
- 700.00.54 - Procedure for Evaluating Quality Control Sample Test Results with Verification Sample Test Results(UP FOR VOTE)
- Significant Updates, Dan to discuss.
- 601.00.49 - Method of Test for Determining the Condition of Concrete Bridge Decks(UP FOR VOTE)
- Andrew to Discuss Changes from Previously Approved Version
Six new business items will also be presented to the committee:
- 601.05.50 Quality Assurance Procedures for Portland Cement Concrete
- Changed the referenced Section in 2.4.5 to 5.2.9 from 4.2.9.
- 604.02.40 Inspection And Acceptance Procedures for Precast Concrete Products
- 6x12 cylinders from the Specification
- 711.03.23 Mix Design for Portland Cement Concrete
- Andrew to Discuss
- 715.14.01 Quality Assurance of Laminated Elastomeric Bridge Bearing Pads with Internal Shims
- Editorial Edits from previously approved version
- 109.00.23 Auto-Authorization of Industry Sample Records
- Addition of a "fast pass" metric for industry sample record payment.
- 109.00.22 Procedure for the Submission and Documentation of Quality Control Test Results
- Adds reference to 109.00.23
The agenda also includes two MPs with editorial changes
- 700.04.22 Operating And Emergency Procedures for Nuclear Gauges
- Renamed from MA-1
- 307.0051 Procedure for Monitoring the Activities Related to Sieve Analysis of Fine and Coarse Aggregate
- Renamed from ML-25
For more details on the meeting packets, including redline copies of changes, click here. Members interested in submitting comments may do so to the CAWV MP Committee Chairman Evan Bailey at evan.bailey@wvpaving.com and/or John Crane at jcrane@asphaltwv.com. Please submit comments prior to the event.
TO JOIN VIA GOOGLE MEET:
https://meet.google.com/qaq-awvh-wcv
To join by phone: 929-329-2405 --- PIN: 516138058
The Next MP committee will be held at MCS&T on August 20, 2025 at 10:00 AM.
Past Posts
Registration for the 45th Asphalt Paving Conference and Award Luncheon is open, click here to register! The Conference and Luncheon will be held on February…
Dana’s journey in the asphalt industry has been shaped by both family influence and her evolving career interests. Growing up with her father, Don, who is a sales representative for Mulzer Crushed Stone, Dana was always surrounded by the world of construction and paving. However, when she started her studies at Marshall University, she wasn’t certain about her career path. It wasn’t until her senior year that she discovered her passion for Human Resources and decided to pursue it further.
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on December 18 at 10:00 a.m. at the Materials Control Soils and…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of December 2024 as shown below.
Period – 12/1/2024
#2 Fuel (Gal) – $2.3226
Asphalt (Ton) – $574.00
Cement (Ton) – $195.28
Historical and individualized information can be found on our Index page.
The WVDOH announces its December Specifications Committee meeting, which is scheduled for Wednesday, December 4 at 9:00 a.m. at the WVDOH Building 5 Conference Room…
For all WVDOH projects let after October 8th, 2024(Initial Announcement), industry is required to enter certified payroll and subcontractor payment data into the WVDOH’s project…
UPDATE – Both class offerings are currently full, however if the certification is still needed please contact the APAWV jcrane@asphaltwv.com UPDATE – The March class…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on November 20 at 10:00 a.m. at the Materials Control Soils and…
The WVDOH Standards & Manuals Committee’s next meeting will be held in person on November 6, 2024, at 9:00a.m. in Room 820 in Building 5…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of November 2024 as shown below.
Period – 11/1/2024
#2 Fuel (Gal) – $2.3201
Asphalt (Ton) – $570.00
Cement (Ton) – $195.28
Historical and individualized information can be found at: https://www.asphaltwv.com/index/