MP Committee Meeting – August 25, 2025
The WVDOH announced their upcoming Materials Procedures (MP) Committee meeting which will be held in person on August 25 at 10:00 a.m. at the Materials Control Soils and Testing Division Conference Rm., 190 Dry Branch Drive, Charleston WV. For those unable to attend in person please join via Google Meet (see details below).
This month’s meeting agenda includes Nine old business items as detailed below.
- 700.04.22 Method for Approving Devices Used for Testing Density and/or Moisture Content of In-Place Material
- Process for creating approved list for Density/Moisture Devices
- 679.02.99 - Calibration of Concrete Continuous Mobile Mixer (UP FOR VOTE)
- This is a guideline for QC to verify the contractor's calibration of volumetric mixers. Kiana to discuss.
- 106.03.50 - General Information Guide for Technician and Inspector Certification Program (TICP) (UP FOR VOTE)
- Changing 3 to 5 years for certification, adds apprentice program.
- 700.00.50 - Method for Acceptance of Compaction Testing(UP FOR VOTE)
- New Acceptance Process through AWP.
- 604.02.40 Inspection And Acceptance Procedures for Precast Concrete Products(UP FOR VOTE)
- 6x12 cylinders from the Specification
- 711.03.23 Mix Design for Portland Cement Concrete(UP FOR VOTE)
- Andrew to Discuss
- 715.14.01 Quality Assurance of Laminated Elastomeric Bridge Bearing Pads with Internal Shims(UP FOR VOTE)
- Editorial Edits from previously approved version
- 109.00.23 Auto-Authorization of Industry Sample Records(UP FOR VOTE)
- Addition of a "fast pass" metric for industry sample record payment.
- 109.00.22 Procedure for the Submission and Documentation of Quality Control Test Results(UP FOR VOTE)
- Adds reference to 109.00.23
Four new business items will also be presented to the committee:
- 700.00.53 Procedure For The Independent Assurance Program
- Updated to reflect comments on the 2024 IA report, Adds the reporting of the WVDOHs 10 percent threshold for QA Verification Samples.
- 106.00.02 Procedure For Evaluating Products For Use In Highway Construction
- Revises our No APL and Non Approval APL Language.
- 106.10.50 WVDOH Buy America Acceptance Guidelines
- Section 8.1.2 In the event of a change order which includes the addition of new materials, a new Certificate of Compliance shall be furnished to include the new materials. Also, adds reference to a newly available tool.
- 606.03.50 Procedure For Determining A Reduced Unit Price To Be Paid For Underdrain Aggregate Which Does Not Conform To The Grading Requirements Of The Governing Specifications
- Adds a sample calculation for clarity and updates the format of variables.
For more details on the meeting packets, including redline copies of changes, click here. Members interested in submitting comments may do so to the CAWV MP Committee Chairman Evan Bailey at evan.bailey@wvpaving.com and/or John Crane at jcrane@asphaltwv.com. Please submit comments prior to the event.
TO JOIN VIA GOOGLE MEET:
https://meet.google.com/qaq-awvh-wcv
To join by phone: 929-329-2405 --- PIN: 516138058
The Next MP committee will be held at MCS&T on October 15, 2025 at 10:00 AM.
Past Posts
The WVDOH Standards & Manuals Committee’s next meeting will be held in person on September 11, 2024, at 9:00a.m. in Room 820 in Building 5…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on August 20 at 10:00 a.m. at the Materials Control Soils and Testing…
AUGUST 27, 2:00-3:30 PM EASTERN TIME Register now! This webinar is RCEP-eligible for live attendance. This insightful webinar focuses on navigating the complexities of Balanced…
Register Here We hope you are planning to join us for our 42nd Annual Fall Meeting on October 10 – 13, 2024, at The Resorts…
Joined by nearly 100 attendees the Women of Asphalt West Virginia Chapter (WofA-WV) welcomed Governor Jim Justice at their 2nd annual luncheon held at the…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of August 2024 as shown below.
Period – 8/1/2024
#2 Fuel (Gal) – $2.5364
Asphalt (Ton) – $595.00
Cement (Ton) – $199.21
Historical and individualized information can be found at: https://www.asphaltwv.com/index/
On July 23, 2024, WVDOH released a message on Bid Express outlining changes to the change orders approval process. Beginning with projects let with the…
The WVDOH announces its August Specifications Committee meeting, which is scheduled for Wednesday, August 7 at 9:00 a.m. at the WVDOH Building 5 Conference Room…
The WVDOH Materials Procedures (MP) Committee’s next meeting will be held in person on July 24 at 10:00 a.m. at the CAWV office located at…
WVDOH has released the Asphalt, Concrete and Fuel price adjustment indices for the month of July 2024 as shown below.
Period – 7/1/2024
#2 Fuel (Gal) – $2.4369
Asphalt (Ton) – $597.00
Cement (Ton) – $196.78
Historical and individualized information can be found at: https://www.asphaltwv.com/index/